Plizio Visual Lab
Kambar-Ata-2 Hydroelectric Power Station

Weather…
Water temperature…
The Kambar-Ata-2 Hydroelectric Power Station is a significant energy infrastructure project located on the upper reaches of the Naryn River. Its origins date back to the 1980s, but the collapse of the Soviet Union led to a long halt in construction. Work resumed in earnest in 2007, leading to the commissioning of the first turbine unit in 2010. Currently, the station provides an installed capacity of approximately 120 megawatts, with plans to reach a total of 360 megawatts upon the completion of all three generating units. The project is notable for the use of massive directional blasting to create the initial rock-fill dam in the narrow mountain canyon. Kambar-Ata-2 is a key component of Kyrgyzstan's strategy to achieve energy self-sufficiency and reduce its reliance on fossil fuels. It serves as a precursor to the even larger Kambar-Ata-1 project, which is intended to become one of the largest power plants in Central Asia.
- Location: Kyrgyzstan
- Nearby: Toktogul (16 km)
Best time to visit & climate
The most pleasant time to visit is Jun–Aug.
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Avg °C | -11 | -9 | -2 | 4 | 9 | 13 | 17 | 16 | 11 | 4 | -3 | -9 |
| Rain mm | 22 | 28 | 39 | 52 | 37 | 22 | 13 | 11 | 11 | 27 | 34 | 26 |
📋 Practical info
Geography
Facts
- Initial design plans for the project were drafted in 1986.
- Active construction was officially resumed in 2007.
- The first generator unit was commissioned on August 30, 2010.
- Current operational capacity stands at 120 megawatts.
- The projected total capacity of the station is 360 megawatts.
- A massive blast in 2009 moved 8 million cubic meters of rock for the dam.
Explore nearby
Notable places around
Route planner — Car & Motorhome
Where do you start? We build the route here, with stops and country notes along the way.
© OpenStreetMap contributors · OpenRouteService
Sights nearby
Frequently asked questions
What is special about Kambar-Ata-2?
Is the facility still being expanded?
How high is the dam?
How many megawatts does the first unit produce?
Can you visit the construction site?
Kambar-Ata-2 Hydroelectric Power Station: where is it located?
Kambar-Ata-2 Hydroelectric Power Station: when is the best time to visit?
Kambar-Ata-2 Hydroelectric Power Station: why is it worth visiting?


















